Gerritsen Inlet Bridge

The new structure will consist of three spans over Gerritsen Inlet. The 35-foot mean high water clearance and the navigable channel width will remain unchanged. The completed structure will include uniform design elements such as railings, lighting, and parapets consistent with the historic character of the original Belt Parkway construction.